Client: Royal Borough of Greenwich

Summary of Works: External and internal refurbishment works to 7 Primary Schools within the Borough of Greenwich.

Contract Value: £900k

Description of works:

Projects across the 7 schools ranged from complete roof renewals, underpinning, fire proofing, internal and external redecorations, window replacements and the complete renewal of hot and cold water pipe works.

For the Heronsgate Primary School in SE18, as well as roof renewal works and window replacements this major project also included the installation of a security lighting system and a full survey and replacement of the drainage system.

For Wingtree Primary School in SE3 a complete refurbishment of the WC block was completed.

For Thorntree Primary School in SE7 works included the strip out and replacement of flooring throughout a prefabricated building.

Fire stopping works and redecorations were undertaken at the Discovery Primary School in SE28.

Canopy repairs and rain proofing plus ground moving repairs were completed at the Robert Owen School in SE10.

At the Mulberry Children’s Centre in SE2 works included specialist roof repairs and internal refurbishment throughout.

At the Fossdene School in SE7 the complete replacement of hot and cold water pipe works were completed at this 3-storey Victorian building.