72-78 Fleet Street, EC4Y

72-81 Fleet Street
72-81 Fleet Street
72-81 Fleet Street
72-81 Fleet Street
  • 72-81 Fleet Street
  • 72-81 Fleet Street
  • 72-81 Fleet Street
  • 72-81 Fleet Street

Client:  Corporation of London
Consultant: Corporation of London

The project involved refurbishment works to the main reception areas to 72-78 and 80-81 Fleet Street and the installation of a basement wetroom.

  • Old suspended ceilings were removed and reinstated with a modern ceiling system and lighting.
  • Walls were stripped back to brickwork, plasterboarded and plastered.
  • New electrics were installed along with the lighting installation.
  • Fire stopping works were carried out to various locations.
  • New Amtico flooring was laid throughout along with new skirtings.
  • The reception areas were redecorated.
  • A new bespoke reception desk was built for 72-78 Fleet Street.
  • A new wetroom was installed in the basement of 72-78 Fleet Street.
  • French polishing was carried out to the main entrance doors.
  • Stone repairs and cleaning was carried out to the front facade and entrance steps.
  • New stainless steel handrails were fitted to the main entrance doorways.

 