72-78 Fleet Street, EC4Y
Client: Corporation of London
Consultant: Corporation of London
The project involved refurbishment works to the main reception areas to 72-78 and 80-81 Fleet Street and the installation of a basement wetroom.
- Old suspended ceilings were removed and reinstated with a modern ceiling system and lighting.
- Walls were stripped back to brickwork, plasterboarded and plastered.
- New electrics were installed along with the lighting installation.
- Fire stopping works were carried out to various locations.
- New Amtico flooring was laid throughout along with new skirtings.
- The reception areas were redecorated.
- A new bespoke reception desk was built for 72-78 Fleet Street.
- A new wetroom was installed in the basement of 72-78 Fleet Street.
- French polishing was carried out to the main entrance doors.
- Stone repairs and cleaning was carried out to the front facade and entrance steps.
- New stainless steel handrails were fitted to the main entrance doorways.