Perronet House Fire Upgrading Works
Elephant & Castle SE1
Contract: £1.1M
Client: London Borough of Southwark
Consultant: Investment & Asset Management Group, Southwark Council
Contract Value: £1.1M
Works were carried out to a six storey residential block over 12 weeks.
- Fire stopping measures both active and passive were carried out across the building.
- New lateral mains were installed to 90 dwellings.
- Electrical upgrades were carried out in 90 properties including mains connected smoke detection and earth bonding.
- New front entrance doors and fire escape doors were fitted to each dwelling.
- New fire doors and screens were fitted to a protected staircase.
- New emergency lighting was fitted to all communal areas including stairs, corridors and entrance lobbies.
- Asbestos ceilings were removed and reinstated with a Gyproc suspended ceiling system with fire breaks and integral access hatches for mechanical and electrical services.
- The entrance lobby had a new ceiling installed with integral flush mounted lighting.
- All communal doors were upgraded or replaced to current fire regulations.
- All communal refuse hoppers were upgraded to current fire regulations.
- District Heating pipes were insulated with a fire resistant insulation.

