BARBICAN BAR & HOSPITALITY SUITE

Barbican Centre, Silk Street, London, EC2

Client: Barbican Centre c/o City of London Corporation

Summary of works: Refurbishment of the Barbican Hospitality Areas

Description of works – Various works were carried out during the Barbican’s summer performance and exhibition recess including:
The refurbishment of the Martini Bar to include bespoke joinery, mechanical and electrical alterations to existing services.
The renewal of bespoke Barbican ‘Tiger print’ carpet and floor coverings.
Refurbishment of the Fountain Room reception and hospitality suite including installation of specialist lighting, power and audio visual system.
Refurbishment to the Stalls Lounge bar area including bespoke joinery, flooring and installation of a new lighting scheme.
Challenges successfully overcome:
Working to the exact time constraints of the Barbican Centre’s Summer Recess with productions, exhibitions and performances arranged several months in advance.
Working within a live hospitality environment with the Barbican Centre still open to the public, 7 days a week.
City Centre location and minimal storage and delivery space on site.

p1070448 p1070441 p1070442 p1070443 p1070445 p1070450-2